Whittier Tunnel Transit Planner
Anton Anderson Memorial Tunnel operating schedules, toll tickets, lane openings, and directions from Girdwood.
Operating Schedule & Tunnel Windows
The Anton Anderson Memorial Tunnel (Whittier Tunnel) is a one-way, shared rail and highway tunnel linking Portage to Whittier. Because the tunnel is single-lane and shared with trains, traffic is strictly scheduled in alternating 20-minute operating windows.
Hourly Tunnel Opening Windows
| Direction | Opening Times (Hourly) |
|---|---|
| Going to Whittier (Portage Side) | Opens at 30 minutes past the hour (e.g., 8:30 AM, 9:30 AM, 10:30 AM) |
| Leaving Whittier (Whittier Side) | Opens on the hour (e.g., 8:00 AM, 9:00 AM, 10:00 AM) |
Arrive Early: Drivers should arrive at the staging area at least 10โ15 minutes before their target opening window. Late arrivals will be held until the next hourly opening.
Tolls & Ticket Fees
Tolls are charged only when driving east toward Whittier (there is no toll collected when leaving Whittier). Tickets can be purchased at the toll booth using cash, credit card, or pre-purchased books.
| Vehicle Type | Round-Trip Fee |
|---|---|
| Standard Passenger Cars & SUVs | $13.00 |
| Vehicles pulling trailers (under 28') | $22.00 |
| RVs & large motorhomes | $38.00 |